Prior to the commencement of any environmental remediation activity on campus such as asbestos abatement or lead paint removal. The Environmental Health & Safety office will notify occupants of the areas which may be impacted or disrupted by the project activities.

 

May 20, 2024: Asbestos Abatement WATERMAN, ROOM 339 AND 339A (FLOOR TILE AND PLASTER CEILING)

BUILDINGS AND AREAS AFFECTED:
WATERMAN, ROOM 339 AND 339A (FLOOR TILE AND PLASTER CEILING)


WHAT IS HAPPENING?
As part of renovations, Environmental Hazards Management, Inc. will remove 511square feet
of floor tile and 454 square feet of plaster ceiling.


DURATION OF WORK:
Start Date: Monday, May 20, 2024
Completion Date: Friday, May 31, 2024
Hours: 6-4:30


WHAT TO EXPECT:
A work area will be constructed outside of the building. During abatement, workers will wear
personal and respiratory protection. Areas will be clearly marked and should not be entered
unless a situation posing an Immediate Danger to Life and Health (IDLH) occurs, and if
possible, this entry should be made with personal and respiratory protection.


CONTACT NUMBERS:
Environmental Health & Safety Phone: (802)656-7233
Physical Plant, Service Operations Support Phone: (802)656-2560

May 20, 2024: Asbestos Abatement MARSH LIFE SCIENCE, ROOMS 133; 135; 135A; 235; 237; 239; 241 AND 243 (TSI\VFT\JOINT COMPOUND)

BUILDINGS AND AREAS AFFECTED:
MARSH LIFE SCIENCE, ROOMS 133; 135; 135A; 235; 237; 239; 241 AND 243 (TSI\VFT\JOINT
COMPOUND)


WHAT IS HAPPENING?
As part of renovations, Environmental Hazards Management, Inc. will remove Thermal
Systems Insulation, Vinyl Floor Tile and Sheetrock \ Joint Compound.


DURATION OF WORK:
Start Date: Monday, May 20, 2024
Completion Date: Friday, May 31, 2024
Hours: 6-4:30


WHAT TO EXPECT:
A containment area under negative pressure will be constructed in multiple areas of the
building. During abatement, workers will wear personal and respiratory protection. Areas will
be clearly marked and should not be entered unless a situation posing an Immediate Danger to
Life and Health (IDLH) occurs, and if possible, this entry should be made with personal and
respiratory protection.


CONTACT NUMBERS:
Environmental Health & Safety Phone: (802)656-7233
Physical Plant, Service Operations Support Phone: (802)656-2560

May 20, 2024: Asbestos Abatement CONVERSE HALL, ROOM 318 (TSI)

BUILDINGS AND AREAS AFFECTED:
CONVERSE HALL, ROOM 318 (TSI)


WHAT IS HAPPENING?
As part of renovations, Environmental Hazards Management, Inc. will remove Thermal
Systems Insulation.


DURATION OF WORK:
Start Date: Monday, May 20, 2024
Completion Date: Friday, May 31, 2024
Hours: 6-4:30


WHAT TO EXPECT:
A containment area under negative pressure will be constructed in room 318. During
abatement, workers will wear personal and respiratory protection. Areas will be clearly marked
and should not be entered unless a situation posing an Immediate Danger to Life and Health
(IDLH) occurs, and if possible, this entry should be made with personal and respiratory
protection.

CONTACT NUMBERS:
Environmental Health & Safety Phone: (802)656-7233
Physical Plant, Service Operations Support Phone: (802)656-2560